US 136 E over MOZINGO BR

S 13 T 64 N R 35 W · County 147, Missouri · Built 2023 · 2 Lanes · 3,518 vehicles/day

Overall
Good
Deck
9
Excellent
Superstructure
9
Excellent
Substructure
9
Excellent

Condition Ratings

ComponentRatingDescription
Deck 9 Excellent
Superstructure 9 Excellent
Substructure 9 Excellent

Location

40.344503, -94.779594

This bridge is in worse condition than 11.1% of bridges in County 147. The average bridge in Missouri is 0 years old; this one is 3 years old.

Nearby Bridges

Bridge Details

Structure #
36678
Year Built
2023
Length
36.6 m (120.1 ft)
Max Span
36.6 m
Width
11.8 m (38.7 ft)
Lanes
2
Daily Traffic
3,518
Material
Prestressed Concrete
Design
Tee Beam
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.