US 50 E over CST NW CHIPMAN RD

S 1 T 47 N R 32 W · County 095, Missouri · Built 2022 · 2 Lanes · 73,858 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
9
Excellent
Substructure
9
Excellent

Bridge Details

Structure #
36658
Year Built
2022
Length
38.5 m (126.3 ft)
Max Span
19.9 m
Width
13.2 m (43.3 ft)
Lanes
2
Daily Traffic
73,858
Material
Prestressed Concrete Continuous
Design
Tee Beam
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.