TIGER RD over NEWTONIA BR

S 11 T 25 N R 30 W · County 145, Missouri · Built 2021 · 2 Lanes · 50 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
9
Excellent

Condition Ratings

ComponentRatingDescription
Deck 7 Good
Superstructure 7 Good
Substructure 9 Excellent

Location

36.895681, -94.173308

This bridge is in worse condition than 30.4% of bridges in County 145. The average bridge in Missouri is 0 years old; this one is 5 years old.

Nearby Bridges

Bridge Details

Structure #
36617
Year Built
2021
Length
9.1 m (29.9 ft)
Max Span
8.2 m
Width
7 m (23 ft)
Lanes
2
Daily Traffic
50
Material
Concrete
Design
Slab
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.