MO 51 S over CASTOR RVR

S 29 T 29 N R 9 E · County 017, Missouri · Built 2020 · 2 Lanes · 717 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
9
Excellent
Substructure
9
Excellent

Bridge Details

Structure #
36614
Year Built
2020
Length
105.9 m (347.4 ft)
Max Span
27.4 m
Width
8.1 m (26.6 ft)
Lanes
2
Daily Traffic
717
Material
Prestressed Concrete Continuous
Design
Tee Beam
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.