MO 149 S over SHUTEYE CR

S 9 T 63 N R 16 W · County 001, Missouri · Built 2021 · 2 Lanes · 275 vehicles/day

Overall
Good
Deck
9
Excellent
Superstructure
9
Excellent
Substructure
9
Excellent

Bridge Details

Structure #
36536
Year Built
2021
Length
37.8 m (124 ft)
Max Span
18.6 m
Width
8.1 m (26.6 ft)
Lanes
2
Daily Traffic
275
Material
Prestressed Concrete Continuous
Design
Box Beam or Girders - Single or Spread
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.