FR 62 over S FK POMME DE TERR

S 13 T 30 N R 20 W · County 077, Missouri · Built 2003 · 2 Lanes · 65 vehicles/day

Overall
Good
Culvert
7
Good

Bridge Details

Structure #
36535
Year Built
2003
Length
14.3 m (46.9 ft)
Max Span
4.7 m
Width
9.1 m (29.9 ft)
Lanes
2
Daily Traffic
65
Material
Concrete Continuous
Design
Culvert
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.