RT J E over FIRST CREEK

S 19 T 45 N R 5 W · County 073, Missouri · Built 2020 · 2 Lanes · 416 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
8
Very Good

Bridge Details

Structure #
36432
Year Built
2020
Length
51 m (167.3 ft)
Max Span
16.8 m
Width
8.1 m (26.6 ft)
Lanes
2
Daily Traffic
416
Material
Prestressed Concrete Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.