CRD TYREE over MCCARTY CR

S 5 T 34 N R 29 W · County 217, Missouri · Built 2021 · 2 Lanes · 10 vehicles/day

Overall
Good
Deck
9
Excellent
Superstructure
9
Excellent
Substructure
9
Excellent

Bridge Details

Structure #
36426
Year Built
2021
Length
26.5 m (86.9 ft)
Max Span
26.5 m
Width
6.8 m (22.3 ft)
Lanes
2
Daily Traffic
10
Material
Prestressed Concrete
Design
Tee Beam
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.