CRD 180 over BR OF TURKEY CR

S 14 T 54 N R 25 W · County 033, Missouri · Built 2020 · 2 Lanes · 25 vehicles/day

Overall
Good
Deck
9
Excellent
Superstructure
9
Excellent
Substructure
9
Excellent

Bridge Details

Structure #
36361
Year Built
2020
Length
40.4 m (132.5 ft)
Max Span
15.2 m
Width
7.5 m (24.6 ft)
Lanes
2
Daily Traffic
25
Material
Prestressed Concrete Continuous
Design
Stringer/Multi-beam or Girder
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.