CONVENTION CTR BLV over CRYSTAL SPRINGS CR

S 2982 T 46 N R 5 E · County 183, Missouri · Built 2020 · 2 Lanes · 3,400 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
8
Very Good
Substructure
8
Very Good

Bridge Details

Structure #
36341
Year Built
2020
Length
31.2 m (102.4 ft)
Max Span
30.5 m
Width
13.7 m (44.9 ft)
Lanes
2
Daily Traffic
3,400
Material
Prestressed Concrete
Design
Tee Beam
Owner
City or Municipal Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.