COUNTY RD 349 over MCKENZIE CR

S 14 T 29 N R 3 E · County 223, Missouri · Built 1975 · 1 Lanes · 30 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
8
Very Good

Condition Ratings

ComponentRatingDescription
Deck 8 Very Good
Superstructure 8 Very Good
Substructure 8 Very Good

Location

37.187222, -90.694444

This bridge is in worse condition than 37.6% of bridges in County 223. The average bridge in Missouri is 0 years old; this one is 51 years old.

Nearby Bridges

Bridge Details

Structure #
36332
Year Built
1975
Length
8.2 m (26.9 ft)
Max Span
1.5 m
Width
3 m (9.8 ft)
Lanes
1
Daily Traffic
30
Material
Concrete
Design
Slab
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$123,000
Total Project Cost
$185,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.