IS 44 E over CENTER CR

S 5 T 27 N R 29 W · County 097, Missouri · Built 2020 · 2 Lanes · 14,858 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
9
Excellent

Bridge Details

Structure #
36315
Year Built
2020
Length
123.3 m (404.5 ft)
Max Span
44.2 m
Width
12.4 m (40.7 ft)
Lanes
2
Daily Traffic
14,858
Material
Prestressed Concrete Continuous
Design
Tee Beam
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.