MO 91 S over DRAIN DTCH 291

S 33 T 28 N R 12 E · County 201, Missouri · Built 2020 · 2 Lanes · 667 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
9
Excellent
Substructure
9
Excellent

Bridge Details

Structure #
36284
Year Built
2020
Length
16.4 m (53.8 ft)
Max Span
16.4 m
Width
8.1 m (26.6 ft)
Lanes
2
Daily Traffic
667
Material
Prestressed Concrete
Design
Box Beam or Girders - Single or Spread
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.