RP IS35S TO MO152E over IS 35

S 11 T 51 N R 32 W · County 047, Missouri · Built 2019 · 3 Lanes · 6,229 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
9
Excellent

Bridge Details

Structure #
36031
Year Built
2019
Length
56.2 m (184.4 ft)
Max Span
27.4 m
Width
14.6 m (47.9 ft)
Lanes
3
Daily Traffic
6,229
Material
Prestressed Concrete Continuous
Design
Tee Beam
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.