DRY FORK EAST RD over TRIB TO GLAIZE CR

S 9 T 42 N R 5 E · County 099, Missouri · Built 2017 · 2 Lanes · 15 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
35679
Year Built
2017
Length
8.5 m (27.9 ft)
Max Span
7.6 m
Width
8.3 m (27.2 ft)
Lanes
2
Daily Traffic
15
Material
Concrete
Design
Slab
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.