MO 76 E over CST PARK WAY WHITE RVR

S 33 T 24 N R 20 W · County 213, Missouri · Built 2018 · 2 Lanes · 6,277 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
35537
Year Built
2018
Length
304.1 m (997.7 ft)
Max Span
44.5 m
Width
9.3 m (30.5 ft)
Lanes
2
Daily Traffic
6,277
Material
Prestressed Concrete
Design
Tee Beam
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.