CREVE COEUR MILL over CREVE COEUR CR

S 31 T 46 N R 5 E · County 189, Missouri · Built 2018 · 2 Lanes · 3,698 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
8
Very Good
Substructure
7
Good

Bridge Details

Structure #
35345
Year Built
2018
Length
17.4 m (57.1 ft)
Max Span
16.6 m
Width
14.2 m (46.6 ft)
Lanes
2
Daily Traffic
3,698
Material
Prestressed Concrete
Design
Box Beam or Girders - Multiple
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.