RT P E over TRIB OF ENON BR

S 6 T 47 N R 2 E · County 183, Missouri · Built 2015 · 2 Lanes · 5,878 vehicles/day

Overall
Good
Culvert
7
Good

Bridge Details

Structure #
34941
Year Built
2015
Length
6.6 m (21.7 ft)
Max Span
6.1 m
Width
8.7 m (28.5 ft)
Lanes
2
Daily Traffic
5,878
Material
Concrete
Design
Culvert
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.