142E-46 over DTCH NO 3

S 23 T 22 N R 4 E · County 181, Missouri · Built 2014 · 1 Lanes · 35 vehicles/day

Structurally Deficient — One or more key components rated 4 (Poor) or below
Overall
Serious
Culvert
2
Critical

Bridge Details

Structure #
34918
Year Built
2014
Length
7.9 m (25.9 ft)
Max Span
2.4 m
Width
5.3 m (17.4 ft)
Lanes
1
Daily Traffic
35
Material
Steel
Design
Culvert
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$150,000
Total Project Cost
$225,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.