STUB RD over FEMME OSAGE CR

S 29 T 45 N R 2 E · County 183, Missouri · Built 2013 · 2 Lanes · 2 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
34634
Year Built
2013
Length
26.7 m (87.6 ft)
Max Span
12.2 m
Width
10.4 m (34.1 ft)
Lanes
2
Daily Traffic
2
Material
Concrete Continuous
Design
Box Beam or Girders - Multiple
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.