MO 95 S over POND FORK CR

S 15 T 23 N R 16 W · County 153, Missouri · Built 2013 · 2 Lanes · 611 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
8
Very Good
Substructure
8
Very Good

Bridge Details

Structure #
34575
Year Built
2013
Length
75.7 m (248.4 ft)
Max Span
25.9 m
Width
8.7 m (28.5 ft)
Lanes
2
Daily Traffic
611
Material
Prestressed Concrete Continuous
Design
Tee Beam
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.