LIBERTY RD over MOZINGO BR
S 6 T 65 N R 34 W · County 147, Missouri · Built 2008 · 2 Lanes · 15 vehicles/day
Overall
Deck
9
Excellent
Superstructure
6
Satisfactory
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 9 | Excellent |
| Superstructure | 6 | Satisfactory |
| Substructure | 6 | Satisfactory |
Location
40.463, -94.759222
This bridge is in worse condition than 56.5% of bridges in County 147. The average bridge in Missouri is 0 years old; this one is 18 years old.
Nearby Bridges
180TH ST over MOZINGO CR
Built 2011
190TH ST over MOZINGO CR
Built 1987
185TH ST over LONG BR
Built 2014
190TH ST over LONG BR
Built 2012
RT NN E over NORVEY CR
Built 1992
180TH ST over NORVEY CR
Built 1992
200TH ST over MOZINGO CR
Built 1995
160TH ST over NORVEY CR
Built 2000
210TH ST over LONG BR
Built 2003
195TH ST over TRIB OF 102 RVR
Built 2020
Bridge Details
- Structure #
- 34486
- Year Built
- 2008
- Length
- 14.9 m (48.9 ft)
- Max Span
- 14.6 m
- Width
- 7.5 m (24.6 ft)
- Lanes
- 2
- Daily Traffic
- 15
- Material
- Steel
- Design
- Stringer/Multi-beam or Girder
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $266,000
- Total Project Cost
- $399,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.