COUNTY RD 530 over MUDDY SHAWNEE

S 31 T 33 N R 13 E · County 031, Missouri · Built 1998 · 2 Lanes · 50 vehicles/day

Overall
Fair
Deck
8
Very Good
Superstructure
6
Satisfactory
Substructure
7
Good

Bridge Details

Structure #
34354
Year Built
1998
Length
12.5 m (41 ft)
Max Span
7.3 m
Width
7.3 m (24 ft)
Lanes
2
Daily Traffic
50
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.