STULTZ RD over BR OF ELK CR

S 20 T 29 N R 9 W · County 215, Missouri · Built 2012 · 1 Lanes · 25 vehicles/day

Overall
Good
Culvert
8
Very Good

Bridge Details

Structure #
34337
Year Built
2012
Length
7 m (23 ft)
Max Span
3.4 m
Width
4.6 m (15.1 ft)
Lanes
1
Daily Traffic
25
Material
Concrete Continuous
Design
Culvert
Owner
Town or Township Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.