DAHLIA TRAIL over E LOCUST CR

S 27 T 66 N R 20 W · County 171, Missouri · Built 2013 · 2 Lanes · 30 vehicles/day

Overall
Good
Deck
9
Excellent
Superstructure
9
Excellent
Substructure
8
Very Good

Bridge Details

Structure #
34269
Year Built
2013
Length
54.9 m (180.1 ft)
Max Span
27.4 m
Width
7.5 m (24.6 ft)
Lanes
2
Daily Traffic
30
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.