US 60 W over CST CAMPBELL AVE US 160

S 14 T 28 N R 22 W · County 077, Missouri · Built 1986 · 2 Lanes · 33,394 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
5
Fair
Substructure
7
Good

Bridge Details

Structure #
3419
Year Built
1986
Reconstructed
2023
Length
68.9 m (226 ft)
Max Span
24.4 m
Width
12.6 m (41.3 ft)
Lanes
2
Daily Traffic
33,394
Material
Prestressed Concrete Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.