FREMONT AVE S over US 60

S 7 T 28 N R 21 W · County 077, Missouri · Built 1989 · 4 Lanes · 12,785 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
5
Fair
Substructure
6
Satisfactory

Bridge Details

Structure #
3415
Year Built
1989
Length
79.2 m (259.8 ft)
Max Span
35.4 m
Width
15.8 m (51.8 ft)
Lanes
4
Daily Traffic
12,785
Material
Prestressed Concrete Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$1,985,000
Total Project Cost
$2,978,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.