FREMONT AVE S over US 60
S 7 T 28 N R 21 W · County 077, Missouri · Built 1989 · 4 Lanes · 12,785 vehicles/day
Overall
Deck
7
Good
Superstructure
5
Fair
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 5 | Fair |
| Substructure | 6 | Satisfactory |
Location
37.142069, -93.271972
This bridge is in worse condition than 85.7% of bridges in County 077. The average bridge in Missouri is 0 years old; this one is 37 years old.
Nearby Bridges
INDEPENDENCE AVE over DRAIN DTCH
Built 1989
NATIONAL AVE S over US 60
Built 1988
NATIONAL AVE over N FK WARD BR
Built 1988
NATIONAL AVE S over COXHEALTH ACCESS R
Built 2009
US 60 E over WARD BR
Built 1988
PRIMROSE ST over S FK WARDS BR
Built 1980
REPUBLIC ST over WARD BR
Built 1987
REPUBLIC ST W over US 60
Built 1990
BU 65 S over US 60
Built 1988
HOLLAND AVE over WARD BR
Built 1975
Bridge Details
- Structure #
- 3415
- Year Built
- 1989
- Length
- 79.2 m (259.8 ft)
- Max Span
- 35.4 m
- Width
- 15.8 m (51.8 ft)
- Lanes
- 4
- Daily Traffic
- 12,785
- Material
- Prestressed Concrete Continuous
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $1,985,000
- Total Project Cost
- $2,978,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.