RT Z N over S FK NORTH RVR

S 8 T 57 N R 7 W · County 127, Missouri · Built 2012 · 2 Lanes · 704 vehicles/day

Overall
Good
Deck
9
Excellent
Superstructure
8
Very Good
Substructure
7
Good

Bridge Details

Structure #
34120
Year Built
2012
Length
59.5 m (195.2 ft)
Max Span
22.9 m
Width
7.9 m (25.9 ft)
Lanes
2
Daily Traffic
704
Material
Prestressed Concrete
Design
Box Beam or Girders - Multiple
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.