US 60 E over CST GOLDEN AVE

S 9 T 28 N R 22 W · County 077, Missouri · Built 1995 · 2 Lanes · 21,949 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
8
Very Good

Bridge Details

Structure #
3396
Year Built
1995
Length
36.9 m (121.1 ft)
Max Span
17.1 m
Width
12.6 m (41.3 ft)
Lanes
2
Daily Traffic
21,949
Material
Prestressed Concrete Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.