RT D E over BR RVR DES PERES

S 35 T 46 N R 6 E · County 189, Missouri · Built 2012 · 5 Lanes · 13,242 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
5
Fair
Substructure
7
Good

Bridge Details

Structure #
33939
Year Built
2012
Length
8.7 m (28.5 ft)
Max Span
8.7 m
Width
28 m (91.9 ft)
Lanes
5
Daily Traffic
13,242
Material
Prestressed Concrete
Design
Slab
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.