RT B E over GRAND RVR

S 34 T 43 N R 31 W · County 037, Missouri · Built 2012 · 2 Lanes · 1,083 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
9
Excellent
Substructure
9
Excellent

Bridge Details

Structure #
33875
Year Built
2012
Length
80.2 m (263.1 ft)
Max Span
33.5 m
Width
7.9 m (25.9 ft)
Lanes
2
Daily Traffic
1,083
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.