VINYARD RD over TRIB TO W FK NIANG

S 28 T 31 N R 18 W · County 225, Missouri · Built 2009 · 2 Lanes · 60 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
7
Good

Bridge Details

Structure #
33771
Year Built
2009
Length
8 m (26.2 ft)
Max Span
6.2 m
Width
8 m (26.2 ft)
Lanes
2
Daily Traffic
60
Material
Concrete
Design
Slab
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.