RP IS70W TO TUCKER over IS 44

S 14 T 45 N R 7 E · County 510, Missouri · Built 2013 · 2 Lanes · 3,273 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
8
Very Good

Bridge Details

Structure #
33657
Year Built
2013
Length
72.2 m (236.9 ft)
Max Span
38.4 m
Width
12.4 m (40.7 ft)
Lanes
2
Daily Traffic
3,273
Material
Prestressed Concrete Continuous
Design
Tee Beam
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.