US 54 E over DRYWOOD CR

S 5 T 35 N R 32 W · County 217, Missouri · Built 1984 · 2 Lanes · 4,057 vehicles/day

Structurally Deficient — One or more key components rated 4 (Poor) or below
Overall
Poor
Deck
7
Good
Superstructure
7
Good
Substructure
4
Poor

Bridge Details

Structure #
3325
Year Built
1984
Length
87.5 m (287.1 ft)
Max Span
22.3 m
Width
13.9 m (45.6 ft)
Lanes
2
Daily Traffic
4,057
Material
Prestressed Concrete Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$1,513,000
Total Project Cost
$2,270,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.