MO 150 E over US 50

S 19 T 47 N R 29 W · County 095, Missouri · Built 2010 · 6 Lanes · 2,531 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
9
Excellent

Bridge Details

Structure #
32912
Year Built
2010
Length
45.1 m (148 ft)
Max Span
22.3 m
Width
14.8 m (48.6 ft)
Lanes
6
Daily Traffic
2,531
Material
Prestressed Concrete Continuous
Design
Box Beam or Girders - Multiple
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$1,665,000
Total Project Cost
$2,497,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.