MO 45 S over BNSF RR

S 33 T 54 N R 36 W · County 165, Missouri · Built 2010 · 2 Lanes · 3,956 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
32893
Year Built
2010
Length
108.2 m (355 ft)
Max Span
41.5 m
Width
10.6 m (34.8 ft)
Lanes
2
Daily Traffic
3,956
Material
Prestressed Concrete Continuous
Design
Tee Beam
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.