HARVEST AVE over SALT FK
S 30 T 51 N R 21 W · County 195, Missouri · Built 2009 · 2 Lanes · 50 vehicles/day
Overall
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 7 | Good |
| Substructure | 7 | Good |
Location
39.181486, -93.257492
This bridge is in worse condition than 26.6% of bridges in County 195. The average bridge in Missouri is 0 years old; this one is 17 years old.
Nearby Bridges
275TH ST over BR OF SALT FK
Built 1997
265TH RD over STRADDLE CR
Built 1973
GOLDEN AVE over SALT FK
Built 2012
US 65 S over STRADDLE CR
Built 1967
MO 41 S over SALT FORK CR
Built 1966
240TH RD over MUDDY CR
Built 1999
US 65 S over SALT FORK CR
Built 1967
246TH TRL over STRADDLE CR
Built 1997
HARVEST AVE over WOLF BR
Built 2015
250TH RD over BR OF SALT FK
Built 2017
Bridge Details
- Structure #
- 32546
- Year Built
- 2009
- Length
- 43.3 m (142.1 ft)
- Max Span
- 13.7 m
- Width
- 7.8 m (25.6 ft)
- Lanes
- 2
- Daily Traffic
- 50
- Material
- Prestressed Concrete Continuous
- Design
- Slab
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- N/A
- Total Project Cost
- N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.