BANNISTER HOLLOW R over LITTLE NIANGUA RIV

S 15 T 38 N R 19 W · County 029, Missouri · Built 2008 · 1 Lanes · 100 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
5
Fair
Substructure
8
Very Good

Bridge Details

Structure #
32391
Year Built
2008
Length
18.9 m (62 ft)
Max Span
9.4 m
Width
5.2 m (17.1 ft)
Lanes
1
Daily Traffic
100
Material
Concrete
Design
Slab
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$214,000
Total Project Cost
$321,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.