HIGHLAND TER N over IS 64 RP IS64W TO BIG B
S 23 T 45 N R 6 E · County 189, Missouri · Built 2008 · 2 Lanes · 10,172 vehicles/day
Overall
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 7 | Good |
| Substructure | 7 | Good |
Location
38.628722, -90.316461
This bridge is in worse condition than 29.8% of bridges in County 189. The average bridge in Missouri is 0 years old; this one is 18 years old.
Nearby Bridges
BIG BEND BLVD E over IS 64
Built 2008
BELLEVUE AVE S over IS 64
Built 2008
IS 64 E over CST CLAYTONIA TER
Built 2008
LOVELLA AVE over CLAYTONIA CR
Built 2022
IS 64 E over E FK DEER CR
Built 1957
IS 64 E over CST MCCAUSLAND AVE
Built 2008
BOLAND PL S over IS 64
Built 2008
BREDELL AVE over CLAYTONIA CR
Built 1990
W BRUNO AVE over BLACK CREEK BR
Built 1976
IS 64 E over CST LACLEDE STATION RD
Built 2008
Bridge Details
- Structure #
- 32228
- Year Built
- 2008
- Length
- 67.4 m (221.1 ft)
- Max Span
- 32.9 m
- Width
- 12.5 m (41 ft)
- Lanes
- 2
- Daily Traffic
- 10,172
- Material
- Prestressed Concrete Continuous
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $1,009,000
- Total Project Cost
- $1,514,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.