EXECUTIVE CENTRE P over SPENCER CR

S 30 T 47 N R 4 E · County 183, Missouri · Built 2005 · 2 Lanes · 1,000 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
31991
Year Built
2005
Length
35.7 m (117.1 ft)
Max Span
14.9 m
Width
19.3 m (63.3 ft)
Lanes
2
Daily Traffic
1,000
Material
Prestressed Concrete Continuous
Design
Stringer/Multi-beam or Girder
Owner
City or Municipal Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.