TRUMAN RD W over IS 670

S 5 T 49 N R 33 W · County 095, Missouri · Built 2006 · 2 Lanes · 5,492 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
9
Excellent
Substructure
8
Very Good

Bridge Details

Structure #
31553
Year Built
2006
Length
64.6 m (211.9 ft)
Max Span
25 m
Width
8.7 m (28.5 ft)
Lanes
2
Daily Traffic
5,492
Material
Prestressed Concrete Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$970,000
Total Project Cost
$1,455,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.