NE 40TH LN over TRIB OF CLEAR CR

S 15 T 33 N R 30 W · County 011, Missouri · Built 2004 · 2 Lanes · 35 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
9
Excellent

Bridge Details

Structure #
30799
Year Built
2004
Length
7.3 m (24 ft)
Max Span
6.7 m
Width
7.8 m (25.6 ft)
Lanes
2
Daily Traffic
35
Material
Concrete
Design
Slab
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.