RT PP S over TEBO CR

S 2 T 41 N R 24 W · County 083, Missouri · Built 1975 · 2 Lanes · 522 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
5
Fair
Substructure
6
Satisfactory

Condition Ratings

ComponentRatingDescription
Deck 6 Satisfactory
Superstructure 5 Fair
Substructure 6 Satisfactory

Location

38.367906, -93.5436

This bridge is in worse condition than 76.2% of bridges in County 083. The average bridge in Missouri is 0 years old; this one is 51 years old.

Nearby Bridges

Bridge Details

Structure #
3073
Year Built
1975
Reconstructed
1997
Length
197.7 m (648.6 ft)
Max Span
43.3 m
Width
9.6 m (31.5 ft)
Lanes
2
Daily Traffic
522
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.