MO 43 S over DRY BR

S 15 T 28 N R 33 W · County 097, Missouri · Built 1977 · 2 Lanes · 7,356 vehicles/day

Overall
Fair
Culvert
5
Fair

Bridge Details

Structure #
3046
Year Built
1977
Length
13.4 m (44 ft)
Max Span
4.3 m
Lanes
2
Daily Traffic
7,356
Material
Concrete Continuous
Design
Culvert
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.