CO SOR44E TO FENTO over IS 44 OR 44
S 22 T 44 N R 5 E · County 189, Missouri · Built 1981 · 4 Lanes · 1,798 vehicles/day
Structurally Deficient
— One or more key components rated 4 (Poor) or below
Overall
Deck
6
Satisfactory
Superstructure
4
Poor
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 4 | Poor |
| Substructure | 6 | Satisfactory |
Location
38.543214, -90.454217
This bridge is in worse condition than 95.9% of bridges in County 189. The average bridge in Missouri is 0 years old; this one is 45 years old.
Nearby Bridges
HORAN DR over TRIB MERAMEC RVR
Built 1975
LARKIN-WM INDUS DR over BR OF YARNELL CR
Built 1975
BOWLES AVE S over IS 44
Built 1981
MONTEVALE CT over YARNELL CR
Built 1991
MARSHALL RD over GRAND GLAIZE CR
Built 1981
IS 44 W over CST YARNELL RD MERAME
Built 2018
IS 44 E over CST YARNELL RD MERAME
Built 2018
RP IS270W TO IS44W over RP IS270E TO IS44W RP
Built 2018
OR 44 E over IS 270 RP IS44E TO IS
Built 1996
IS 270 E over IS 44 RP IS270E TO IS
Built 1962
Bridge Details
- Structure #
- 3031
- Year Built
- 1981
- Reconstructed
- 2014
- Length
- 111.6 m (366.1 ft)
- Max Span
- 24.2 m
- Width
- 23.6 m (77.4 ft)
- Lanes
- 4
- Daily Traffic
- 1,798
- Material
- Steel Continuous
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $2,357,000
- Total Project Cost
- $3,536,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.