COUNTY ROAD 356 over CR TO TOBIN CR

S 34 T 65 N R 12 W · County 199, Missouri · Built 2003 · 2 Lanes · 15 vehicles/day

Overall
Fair
Deck
8
Very Good
Superstructure
6
Satisfactory
Substructure
5
Fair

Bridge Details

Structure #
29853
Year Built
2003
Length
9.1 m (29.9 ft)
Max Span
8.8 m
Width
6.2 m (20.3 ft)
Lanes
2
Daily Traffic
15
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.