US 60 E over ELEVEN POINT RVR

S 3 T 26 N R 9 W · County 091, Missouri · Built 2003 · 2 Lanes · 3,960 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
8
Very Good
Substructure
7
Good

Bridge Details

Structure #
29565
Year Built
2003
Length
122.7 m (402.6 ft)
Max Span
25.6 m
Width
12.4 m (40.7 ft)
Lanes
2
Daily Traffic
3,960
Material
Prestressed Concrete Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.