PUMP STATION RD over RED OAK CR

S 31 T 42 N R 4 W · County 073, Missouri · Built 2000 · 2 Lanes · 40 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
29447
Year Built
2000
Length
8.2 m (26.9 ft)
Max Span
2.8 m
Width
6.9 m (22.6 ft)
Lanes
2
Daily Traffic
40
Material
Concrete Continuous
Design
Slab
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$123,000
Total Project Cost
$185,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.