MO 68 E over COPPEDGE CR

S 35 T 39 N R 7 W · County 125, Missouri · Built 1975 · 2 Lanes · 2,868 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
7
Good

Bridge Details

Structure #
2865
Year Built
1975
Length
44.2 m (145 ft)
Max Span
12.2 m
Width
14.3 m (46.9 ft)
Lanes
2
Daily Traffic
2,868
Material
Concrete Continuous
Design
Slab
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.