US 36 W over GRAND RVR OVRFL

S 17 T 57 N R 24 W · County 117, Missouri · Built 1955 · 2 Lanes · 4,678 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
5
Fair
Substructure
5
Fair

Bridge Details

Structure #
28533
Year Built
1955
Reconstructed
1994
Length
92 m (301.8 ft)
Max Span
8 m
Width
9.6 m (31.5 ft)
Lanes
2
Daily Traffic
4,678
Material
Concrete Continuous
Design
Slab
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$1,389,000
Total Project Cost
$2,084,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.